Rambler Atlanta

 

The LV Collective recently completed the Rambler Atlanta high rise on Peachtree Street located less than a half mile from the Georgia Tech campus. The LV Collective focuses on creating upscale student-oriented housing and this beautiful 19-story high rise features 467,000 square feet of living space. With 215 units and 798 beds, the floor plans vary from studios to up to six-bedroom units where every resident has their own space. As part of the common areas, they offer a coffee shop, study rooms, conference rooms, an outdoor terrace, and at the top of the building a rooftop pool, hot tub, sauna, yoga studio and fitness center. The LV Collective retained United Consulting to assist with the various geotechnical tasks required to complete the design of the foundation for the high rise. The main challenge for our work at the site was that, prior to development, it was an operational surface parking lot. Therefore, extensive coordination was required in advance of the fieldwork for each task to accomplish its goal while effectively managing relations between the current site owner and the LV Collective. The LV Collective reached out to United Consulting when they first began exploring the possibility of purchasing and developing this site. Spread over multiple phases of work, we performed several standard penetration test (SPT) borings and rock coring within a selection of these borings. The next phase of work was to conduct a site-specific shear wave survey in attempt to upgrade the Seismic Site Classification. Since the property is about a 10-story building built above a parking deck, there was concern that this building’s foundation may underlay the edge of the project site. United Consulting conducted a visual analysis and then an excavation to investigate the foundation to determine its outer edge relative to the property line. As the building design progressed and LV Collective’s vision for the site crystallized, infiltration testing and additional SPT borings were conducted to further determine parameters for foundation recommendations. This also included rotary percussion drilling deep into the rock at selected column locations to better understand its depth and competency. Lastly, during construction, United Consulting provided full-time construction materials testing (CMT) and special inspections services for the client.

 

During our geotechnical explorations we identified that a portion of the site’s current grade was underlain by fill material. Additionally, at one boring location, we found low consistency soils. As design plans developed, the proposed finish floor elevation was below these depths so reduced the chance that they would affect the proposed building foundations. Our foundation investigation determined that the adjacent building was founded on drilled piers and that they did not significantly encroach on the site. This was great news for the client as they will need to build a retaining wall along this side of the site. As the design was finalized, in consultation with the client, it was determined that drilled piers founded on rock would be the most economical foundation choice. The additional geotechnical exploration work assisted the client, design team and drilled pier contractor with refining their plans as the competent rock varied greatly in depth across the site making this phase critical. Our CMT Project manager worked closely with the design and construction team to make sure that all required testing and inspections were performed in a timely manner. All deficiencies noted during our field visits were immediately communicated to the general contractor, which helped them take any necessary corrective actions to minimize construction delays. Our scheduling and managing team were available to assist in making sure the correct personnel were available for the required special inspections. Accurate documentation and timely reporting provided valuable information to the construction and design team keeping them aware of inspection progress. This reporting system also helps save time by keeping our testing and inspections in step with construction progress. This prevents unnecessary costly delays, which helps to keep the project on time and on budget.

Back To Top