Skip to content

UT Southwestern Medical Center – PHMS Pediatric Hospital

 

This project consists of the construction of two 12-story hospital towers and an 8-story research facility spread across 33 acres near Dallas’s Love Field Airport. Once completed, the expansion will increase the existing UT Southwestern Medical Center footprint by more than 2-million square feet. The site is adjacent to ongoing hospital operations in a busy urban environment with a constant flow of vehicle and foot traffic at the existing hospital and nearby major airport. Construction required permanent basement walls extending as deep as 70 feet below the existing ground level. The support for the excavation included shoring walls with soldier piles up to 85 feet deep, tiebacks anchored as deep as 130 feet behind the wall, and shotcrete lagging at the face. Dewatering wells behind the wall were also installed to keep the groundwater table below the level of the excavation as it proceeded.

 

United Consulting provided an automated monitoring system during the excavation to ensure that the shoring wall performed as designed during excavation and construction. This was critical to ensure that the existing medical center operations nearby were not compromised in any way and remained fully functional. With the installation of 45 monitoring prisms, spread around within the massive excavation footprint for the shoring walls, it required two automated robotic total stations to monitor them due to the long lines of sight. Notification alarms for displacement and settlement were set at specific levels by the wall designer, to ensure that the shoring wall was performing as designed throughout construction. At one point during the project, one of the robotic total stations sent out an email alarm for excessive movement relating to a monitoring prism on the shoring wall. However, the movement was in an unexpected direction away from the excavation. The alarm triggered an inspection of the wall location. It was discovered that soil behind the wall was settling and migrating down into the excavation below the bottom of the wall after a period of heavy rainfall. This was due to the dewatering system that had terminated in a silt layer and was not adequately lowering the water table in this area of the site. Additional dewatering wells needed to be installed deeper below the silt layer down into the shale formation below. The monitoring data provided great value because it allowed the construction team to track the movement of the shoring walls as the excavation progressed. This ensured that the factor of safety was not compromised while the additional wells were installed and brought online. The design-build team was then able to implement a cost-effective solution to repair the area behind the wall by grouting the voids that were formed due to the inadequate dewatering wells. The monitoring data confirmed that movement of the wall had substantially slowed back to safe levels, once the area was completely remediated, and they could then safely continue the excavation.

Back To Top