Skip to content

Northside CHerokee tower  – LOOP ROAD, CEP

 

As part of Northside Hospital Cherokee’s Master Plan to increase the availability and quality of available care in the area, development is underway for a new 12-story, 525,000 square-foot standalone expansion with a 105-bed patient tower, 30 emergency department exam rooms, 2-story dining terrace building, and many other facilities. The Tower project will also include a 25-foot Mechanically Stabilized Earth (MSE) retaining wall, a two-story Central Energy Plant (CEP) building with 32-foot MSE or cast-in-place retaining wall, and a new perimeter Service Loop Road. As our geotechnical investigation revealed, a careful geotechnical evaluation would be required to make essential, location-specific foundation recommendations while providing the client with as many alternatives as possible to satisfy their budget. Existing topography on the project site, including steep slopes and existing retaining walls, posed the greatest challenge from both a design and Geotechnical exploration standpoint. The designer would have to factor in removal of existing walls and replacing them with new ones suitable for the new construction. Some of the boring locations were also on uneven terrain very close to a precipitous drop-off, making drill rig access somewhat more complex than we see on a flatter, more open tract. The preliminary geotechnical exploration consisted of drilling twenty-six (26) Standard Penetration Test (SPT) borings at selected locations in the proposed structures’ footprints and loop road area, and coring twenty (20) feet of rock in one boring and twenty-five (25) feet of rock in one other boring. The soil encountered in many of the borings consisted of between 3 and 8 feet of fill soils, generally debris free and of variable consistency. Below those depths, residual soils typical of the Piedmont Physiographic Province of Georgia consisted of loose to very dense sand, or very soft to hard silt. The rock cores extracted at various depths revealed fair to poor rock quality designation (RQD) percentages, ranging from 0 to 73% in boring B-4 and ranges from 0 to 45% in boring B-5.

 

Our recommendations for site preparation included some remediation of the low consistency soils through densification, removal, and re-compaction or replacement with new engineered fill. Existing improvements, including landscaping and underground utilities, should be removed to avoid any future sinkholes in these areas due to settlement. From a mass grading standpoint, difficult excavation due to partially weathered rock (PWR) was not foreseen. However, in the area of the MSE retaining wall where slopes must be cut back, operations typical of difficult excavation (use of jackhammers, ram hoes, or limited blasting) must be planned for to facilitate geogrid placement, contingent on final wall design. Our preliminary foundation recommendations were location specific. For the 12-story tower, we suggested drilled piers bearing in rock or PWR or, as an alternative, Augered Cast-in-Place Piles. For the CEP and Dining Terrace, we recommended aggregate piers. The client informed us that Micro Piles would also be considered for support of the CEP building, and we were able to issue our detailed recommendations if they chose to proceed with that option, including advised depths below the planned finished floor elevation (20-30 feet). A specialized contractor should decide the number of piles and layout required to support each area of the structure based on its anticipated load, which provides flexibility, utilizing a combination of fewer higher capacity micropiles rather than a greater number of lower capacity micropiles. Looking to acquire more subsurface data with the goal to improve the seismic site class, the client requested United Consulting return to perform Site-Specific Shear Wave Analysis. Shear Wave testing is used to estimate engineering parameters of the upper 100 feet of soil with the purpose of determining the site-specific seismic risk for structural building design. Based on the results, we determined the Project Site is within a Site Class BC, indicating a mixture of hard rock and very dense soil to soft rock conditions with a high shear value.

 

Most recently, United Consulting performed a slope stability study, which involved drilling two more SPT borings along the slopeside of the CEP Building. Samples of soil and rock recovered revealed similar conditions compared to the previous boring locations, with a moderate improvement in depth to top of PWR and overall RQD. Our calculations indicated that in order to achieve required safety and global stability factors, the wall foundation must extend at least five feet below the lowest adjacent ground surface. A minimal settlement of 1 inch and differential settlement of ½ inch over a span of 50 feet was estimated based on the maximum distributed pressure with five (5) feet of foundation embedment. While all the data collected helped the client make informed decisions on final design specifications, they maintained the freedom to choose alternative solutions to fit their budgets. The Shear Wave Analysis, in particular, really paid dividends, allowing the client to plan for less stringent structural design specifications versus what we typically see in Greater Atlanta Area. With a massive construction project such as this, any potential cost savings can have an exponential impact on the overall budget.

Back To Top