Rambler Atlanta
Atlanta, Georgia

United Consulting was contracted to perform a geotechnical exploration of the 0.5-acre project site located at 224 Fannin Street in Houston. The property once had a structure on it for a brief period from about 2002 to 2008 but is currently open greenspace. The project will consist of a new 76-unit, seven-story, 75,000-square-foot assisted living and memory care facility being developed by Research Update, a non-profit educational organization founded to promote clinical research and its application to enrich community health. Since the drives and other areas are designed to consist of reinforced concrete pavement and not asphalt, one of the main concerns was the corrosiveness of the native water and soil located on the property, which can pose minor to moderate corrosive effects on the concrete and rebar. Also, expansive soils were found, as is common in this geographic region of Texas, indicating high shrink-swell potential, making them prone to heaving and requiring lime stabilization and extra care regarding moisture control during construction. United Consulting drilled five Standard Penetration Test (SPT) borings to depths of 30 feet to 50 feet. Samples were obtained at 2-foot intervals in the first 10 feet and 5-foot intervals below 10 feet, revealing clayey gravel ranging from very loose to dense at more shallow depths indicating the presence of undocumented fill. Beneath the fill material, native soils composed of lean clay ranging in consistency from firm to hard were encountered up to depths of 30 – 35 feet, making them primarily unsuitable for reuse as engineered fill due to their high plasticity. Based on the geotechnical data and the proposed building our recommended foundation design would be deep foundations, using drilled shafts 25 feet below the ground surface with a minimum shaft diameter of 24 inches. Also, as part of the scope of work, the level of sulfate and chloride in the soil were evaluated as per ACI 318-19 (22) Edition criteria, to determine reactivity to the concrete slabs and pavement. It was found that the level of sulfate would have a minor impact on concrete performance or any lime stabilization. Chloride levels in the soil also indicated a minor risk for rebar corrosion with Portland cement. However, the soil resistivity test indicated moderately corrosive soils. We therefore recommended a qualified corrosion engineer be consulted regarding the protection of buried steel or ductile iron and conduit, or at minimum to follow the manufacturer’s recommendations for corrosion protection.
Based on the expected traffic levels, we were also able to provide specifications for pavement design, recommending 4,000-psi reinforced concrete at 5 inches in thickness for standard duty pavement and 6-inch thickness for heavy duty pavement, both with 12 inches of lime-treated subgrade base. Pavements should be constructed using materials and methods in compliance with the Texas Department of Transportation (TxDOT). Despite some concerns in the way of design that must be considered, we were able to make some cost-saving recommendations. While the fill soils were generally not suitable for reuse as engineered fill, they may be reused at depths 2 feet below subgrade and compacted according to provided specifications. Deep foundations for multistory buildings are typical in these native soil conditions. We stressed the most critical factor being a well-prepared subgrade, which will prevent concrete slab cracking and potholes in the pavement, leading to reduced maintenance costs in the future.