The Houston Food bank is currently expanding its capabilities to serve the community by constructing a new 325,000 square foot facility located at Texas 249 and Ella Blvd. The complex will sit on a 53-acre parcel worth $10M generously donated by Chevron. “The Hub” project, as it is known as, consists of a multiple story warehouse distribution center, 4-floor parking garage, on-grade parking lots, several detention ponds, outdoor entertainment areas, and access drives. The building utilizes the tilt panel construction method. The main structure will offer education, health and wellness resources, housing, financial and job support, while the grounds will provide exercise and child-friendly amenities. Using the Geotechnical data from another consultant, one of the challenges for this project was also coordinating with other outside consultants to perform some of the testing, so this added another layer of complexity to the project management component. During foundation installation, United Consulting would be required to work closely with the Geotechnical Engineer of record to remediate any insufficient areas. This action could either be carried out on the spot or at a later date as agreed upon by personnel from both firms. The scope of services included subgrade evaluations and compaction testing during placement of structural fill materials in the building pads and parking areas. Also, testing of concrete including design review and verifications, as well as structural steel placement, fireproofing inspection, and exterior window testing were contained in the scope. Inspection of the Concrete Masonry Unit (CMU) walls were performed during their construction and required observation and inspection on a full-time basis, quite an undertaking for such a large structure! One somewhat uncommon request was testing the concrete slab/floors for moisture emissions, which is performed once the interior has become acclimated to the HVAC system, and is to eventually be used by the flooring installer to select the proper materials (i.e. moisture-barrier). As construction progresses, additional tasks that are part of this contract will be performed at a later date. While we were able to provide a majority of the required testing in-house, we collaborated with partner consultants for some additional tests as part of our effort to provide a truly comprehensive package. However, our previous experience with these firms allowed us to accomplish this quite easily, capitalizing on good existing relationships with these organizations.