Medlock Bridge Road (SR 141) Pedestrian Crossing

 

Johns Creek considers the Medlock Bridge Pedestrian Crossing Tunnel as a significant project as part of the greater Town Center Vision & Plan. This tunnel will connect the new trails, which are part of the linear parks, located near City Hall, and the Johns Creek Greenway. This is part of the next step in the evolution of the Town Center Vision & Plan which includes a 192-acre area. The tunnel will pass beneath Medlock Bridge Road, which is a heavily utilized State Route that accommodates about 45,000 vehicles per day. The tunnel will consist of an 11-foot-tall precast reinforced concrete arch culvert that will be 42 feet wide and about 120 feet in length with the top of the culvert about 12 feet below the paved surface of Medlock Bridge Road. For this project United Consulting was contracted by Michael Baker International to provide foundation recommendations for the tunnel and wing walls. The greatest challenge for this project was drilling along the side, and center, of the road with minimal impact to the traffic on Medlock Bridge Road.

 

United Consulting drilled five (5) standard penetration test (SPT) borings for this project while advancing two (2) of the borings to a depth of about 45 feet and the other three (3) borings were drilled to augur refusal, over 80 below the existing grades. In order to conduct the borings, a traffic control program was required. We coordinated permission to do the fieldwork with GDOT’s Area and District Engineer along with the City of Johns Creek’s representatives. In addition to the typical soil samples and N values gathered from the borings, several undisturbed Shelby tube soil samples were obtained for a detailed analysis of their composition utilizing the Unified Soil Classification System (USCS) and consolidation testing in our lab. The USCS includes grain size analysis along with determining the liquid limit and plasticity index. The soil parameters affecting the installation methodology and performance of the deep foundations were evaluated. Our Culvert Foundation Investigation (CFI) was completed using GDOT’s Load and Resistance Factor Design (LFRD) protocol and in accordance with AASHTO LRFD design. Upon completion of the field and laboratory testing, the geotechnical engineers, in consultation with the structural engineer, determined that driven piles were the best foundation option for this project. The supporting analyses were performed using Apile to determine Pile Bearing capacities and GRLWeap to simulate the pile driving parameters for both the culvert and wing wall foundations.

 

For this project the design team needed our expertise in determining a safe and economical culvert foundation. The borings we drilled provided the soil consistency, depth to groundwater, depth to rock and the samples tested in our lab provided the information required for further analysis of the proposed foundation’s performance. Utilization of GDOT’s LFRD and AASHTO LRFD standard provided the bases of the design criteria. The Apile and GRLWeap models incorporate the geotechnical data we gathered, along with the required foundation parameters, to predict the proper driving hammer be selected by the construction contractor. These programs also provide data regarding the basis of the pile driving, to avoid overstressing of the pile during installation, and overall pile capacity.

 

 

 

 

For this project, GDOT has opted to pioneer a new DB process. In this process, the prime contractor is a construction company that takes on the liability for delivering the project and retains other engineering firms as part of their team to conduct the various review tasks mentioned above. United Consulting acts as an independent consultant for the team as a quality control reviewer, and our team comments on geotechnical documents produced by the other team members. We make sure all geotechnical documents adhere to GDOT’s standards and that geotechnical changes are ultimately constructable. Unlike GDOT’s typical 6-to-8-week timeline, our reviews are required in about one week. Due to having multiple BFI and WFI reports to review, this time savings compounds into months of saved time in the overall project schedule. Our role as an intermediate subject matter expert (SME) ensures that engineering reports move quickly through GDOT’s review process while maintaining their required level of quality control.

 

Our geotechnical support has played a critical role for GDOT in pioneering the new DB project delivery process. The expeditious work of our team to our direct client, i.e. the lead independent consultant, through backchecking multiple revisions and providing geotechnical expertise to the prime contractor has aided in delivering this project on time and in budget. Our front-end review allows a more complete report by the time it reaches the GDOT-employed reviewer’s desk, enabling a quicker acceptance of design submittals. This process also helps GDOT significantly reduce the potential for being responsible for project delays due to design documents not being approved in a timely manner by the GDOT team. Our role in working for the construction company is committed to maintaining GDOT standards on their behalf while accomplishing the review and approval process in a fraction of the time typically taken for these tasks. The use of engineering consultants such as United Consulting in this innovative DB process benefits both GDOT and their designated consultants by freeing their engineering staff to focus on other projects and limiting delays due to the overall volume of projects they oversee.