Northside Hospital Cherokee – MOB III & Parking Deck

 

In 2025, Northside Hospital Cherokee broke ground on a six-story, 150,000-square-foot Medical Office Building, or “MOB”, that expands healthcare access and meets the growing needs of Cherokee County’s rapidly increasing population. As part of their due diligence, Northside Hospital Cherokee retained United Consulting’s services to perform a Geotechnical Exploration at the property for the proposed steel-framed office building, a future parking deck planned with nine (9) levels, and an associated 48-foot-high Mechanically Stabilized Earth (MSE) retaining wall. In late 2024, we conducted a preliminary geotechnical investigation, providing our recommendations based on possible design and construction specifications. At that time, the design wasn’t finalized to the point where a steel framed or concrete framed structure was decided upon. We returned early in 2025 to perform supplemental explorations once the design was closer to being finalized. The challenge of this project, as our explorations progressed, was that we had to make some complex recommendations based on our technical findings.

As part of the preliminary exploration, we drilled twenty-two (22) Standard Penetration Test (SPT) borings and six (6) straight auger borings which were used for infiltration tests. Rock coring was performed in three (3) of the borings ranging from twenty (20) to forty (40) feet below auger refusal to ascertain the rock’s quality for potential foundation support. For the supplemental investigation, twelve (12) additional SPT borings and five (5) test pits were excavated. The additional borings were focused on an area of the proposed building not included in the preliminary exploration and the remaining boring helped us shape our recommendations for the MSE wall. As recommended in our preliminary geotechnical exploration report, the purpose of the test pits was to better understand the likelihood that suspected deleterious materials such as organics and/or buried trash might be encountered during mass grading. Investigating this during the exploratory phase of development avoids surprises that can have long term negative effects on subsurface stability.

Our findings indicated the presence of large amounts of undocumented fill, which creates uncertainty about the consistency of soil composition outside of the boring and test pit locations. The probability of difficult excavation due to intermittent partially weathered rock (PWR) being found throughout the site, would have an impact on the MSE wall foundation and underground utility construction. Based on the proposed building type we were able to recommend that it could be supported by aggregate piers, while the multilevel parking deck would require a foundation supported by drilled piers. Finally, based on our calculations, the proposed retaining wall was expected to have significant settling, which the wall designer would have to consider.

Our foundation recommendation for the MOB is the most cost-effective manner to support a multilevel structure and represents significant cost savings over other options for deep foundations. The identification of a significant amount of undocumented fill soils will assist the owner in planning a realistic construction budget that is better prepared for unknown site conditions that are difficult to completely characterize during the exploration phase of a project. Also, the identification of the amount of anticipated settlement of the MSE wall will be important for the design and construction considerations. While many of our findings posed technical as well as budgetary challenges, the benefit of our analysis creates clear expectations by providing valuable information that can be utilized by the architects and engineers in the planning and design phases.

Back To Top