Atlanta beltline westside trail

Atlanta Beltline Westside Trail – Segment 4 stretches from Lena Street NW to near Law Street NW in Atlanta, Fulton County, Georgia. It runs alongside Washington Park, a vibrant and historically significant neighborhood established over a century ago as one of Atlanta’s first planned Black suburbs. With the completion of Westside Trail – Segment 4, Westside Trail is now the longest uninterrupted Beltline stretch yet, with 6.7 miles of paved trails linking Pittsburgh Yards in Southwest Atlanta to Huff Road in Blandtown. It’s all about providing access and connecting communities. United Consulting’s environmental industry-leading experience was instrumental in facilitating this project.

 

United Consulting served Atlanta Beltline Inc. (ABI) as a sub consultant through Alta Planning + Design, Inc. (Civil – Prime) on this exciting Westside Trail – Segment 4 project. Prior to its redevelopment, the Westside Trail – Segment 4 generally consisted of portions of former railroad bed, former City of Atlanta right-of-ways, MARTA properties, and a recreational park. The Westside Trail was designed as a public transportation right-of-way within a “green” setting to allow for walking, jogging, biking, roller skating and roller blading, as well as wheelchairs and mobility aids, and future transit. Westside Trail – Segment 4 runs alongside Washington Park, a vibrant and historically significant neighborhood established over a century ago as one of Atlanta’s first planned Black suburbs. The recreational park of the same name served as a cornerstone of development for the community and a cultural hub—a purpose that has persevered to this day, including hosting events organized by the Beltline.

 

United Consulting provided industry leading environmental consulting and geotechnical engineering services on this project starting in 2020. This section of the Atlanta Beltline was challenged with the presence of environmental contaminants mostly associated with the historical CSX railroad line operations. As part of the environmental process for this project United Consulting completed a comprehensive evaluation of the Brownfield status of the overall Beltline and summarized various documents; acted as a liaison between ABI and State agencies, including coordination and leading numerous meetings with the EPD Brownfield Unit relative to the original Beltline Corrective Action Plan (CAP); completed and managed various soil and groundwater assessments and documented their completion; assisted with the development of remediation bid documents; managed various soil remediation and its associated documentation process; provided guidance to the ABI relative to management of environmental risk associated with the project, among other tasks; and  completed amendments to the Beltline CAP.

 

During the design process, United Consulting collected extensive environmental data. This data included soil and groundwater sampling. Environmental contaminants mostly associated with the historical CSX railroad line operations were present in this section of the Atlanta BeltLine. The environmental data identified the primary contaminants as arsenic and petroleum related constituents. In turn, we prepared various environmental Brownfield documents detailing the EPD approved soil remediation and engineering control measures required to ensure a safe environment for trail users. The overall general approach included isolated soil remedial activities and a cap and cover system for remaining impacted media. The areas requiring soil remediation were delineated prior to the construction bidding and remediation activities which creatively reduced the risk for potential construction delays or cost overruns. In addition, the isolated soil remediation allowed fewer trucks to haul contaminated soil to a landfill, which reduced greenhouse gas emissions associated with the trucking process. The cap was analytically tested in accordance with EPD approved protocol to ensure the remaining soil conditions met the cleanup standards for the overall BeltLine.

 

Throughout the project, the United Consulting team was sensitive to the project’s timing needs, and often delivered faster than typical project timelines to meet deadlines imposed by possible funding sources. United Consulting was always ready and available to act quickly. With these quick actions, there was no delay in the project schedule. United Consulting overall services were provided on time, and within budget. Ultimately, our environmental industry-leading experience was instrumental in “paving” the way to make this project possible. Creative thinking, timely responsiveness, and detailed communication were paramount in assuring the protection of human health and the environment throughout the project process and for generations of trail users to come