Gwinnett Co. Fire and Emergency Services Training Academy Fire and Smoke Training Tower

 

Gwinnett County intends to demolish their existing Fire and Smoke Training Tower at their Fire and Emergency Services Training Academy in favor of a modern training tower. United Consulting was contacted by Gwinnett County to perform Asbestos and Lead-Based Paint Inspections of the tower prior to demolition. In Georgia, asbestos inspections are required for all buildings in order to obtain a demolition permit. Lead-based paint inspections are also preferred for any building built prior to the Environmental Protection Agency’s ban on lead-based paint in 1978.

 

Our team was made aware that the demolition of the structure was already put out to bid, which made time of the essence. United Consulting was able to mobilize within three business days of receiving notice to proceed.  United Consulting’s Asbestos Inspector collected samples of building materials that are suspected to contain regulated concentrations of asbestos fibers. Building materials which typically asbestos fibers include caulks, mastics, flooring, and roofing. These samples are then submitted to an accredited laboratory for analysis of the samples to determine the percentage (if any) of asbestos fibers.

 

United Consulting’s Lead-Based Paint Inspector tested painted surfaces on the structure for the presence of paint containing lead. This testing was done using our in-house an x-ray fluorescence (XRF) device. The XRF device can give real-time lead in paint readings and eliminates the need for destructive sampling techniques and laboratory testing, which both save time.

 

Fortunately for Gwinnett County, none of the sampled building materials were found to contain regulated concentrations of asbestos fibers. Additionally, none of the painted surfaces were found to contain lead-based paint above the action level. United Consulting was then able to provide the results to Gwinnet County within six business days from notice to proceed as to not impede the process of getting the building demolished.

Back To Top