PHMS Pediatric Hospital
Dallas, Texas
United Consulting was initially retained by Solomon & 5th Street Partners, LP c/o Collaborative Housing Solutions to perform a Phase I Environmental Site Assessment (Phase I) at a property in Griffin, Georgia (Spalding County) in substantial conformance with the scope and limitations of ASTM Practice E 1527-13 and the 2022 Department of Community Affairs (DCA) environmental guidelines. The property was a 1.26-acre tract of land with various environmental issues, and the client was seeking tax credits for the purpose of constructing a multi-family housing complex, which made it a complex transaction. Portions of the property historically operated as Gossett Oil, a filling station, an automotive repair facility, and a newspaper printing facility. Multiple off-site facilities of concern were also identified, which included underground storage tank facilities, a leaking underground storage tank facility, industrial facilities, and automotive repair facilities. In conjunction with Phase I, United Consulting conducted a limited asbestos and lead based paint survey for the Project Site. United Consulting conducted lead in soil sampling on the Project Site due to the presence of pre-1978 structures. United Consulting also conducted a noise assessment for the Project Site based on the location of the proposed structures and outdoor amenity areas. A “Normally Unacceptable,” noise level, as defined by HUD, was calculated at the three noise assessment location (NAL) points on the Project Site. A Noise Attenuation Plan was prepared for the proposed development, which showed the Sound Transmission Class (STC) requirements of the construction materials that will be utilized to sufficiently aid in mitigating the indoor day-night average sound level (DNL) to below 45 decibels (dB) at the Project Site. A Cultural Resources Records Review and Reconnaissance was performed, identifying multiple historic buildings within and near the Area of Potential Effect. An Environmental Review package was submitted to the Georgia Historic Preservation Division (HPD).
United Consulting performed a limited Phase II Environmental Assessment (Phase II) at the Project Site to assess for potential impacts associated with the concerns identified during Phase I. A total of four soil samples and four groundwater samples were collected during drilling activities at the Project Site. The samples were analyzed for volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), and Priority Pollutant Metals. In total, six VOCs, two SVOCs, and eight metals were detected in the soil samples analyzed. The concentrations of these compounds were screened against their applicable Georgia Environmental Protection Division (EPD) Hazardous Sites Response Act (HSRA) notification concentrations (NCs). One VOC constituent, xylene, was detected at concentrations above its applicable NC.In conjunction with Phase II, our team utilized ground penetrating radar (GPR) to assess for potential underground storage tanks (USTs) on multiple areas of the property. No indications of USTs or former tank pits were identified on the Project Site. Petroleum-related compounds were detected in soil and groundwater samples from two locations on the Project Site. Based on the results of the Phase II assessment, a petroleum release to groundwater at the Project Site was identified. United Consulting concluded it was likely this release was associated with an off-site UST release. Based on the results of Phase II, our team recommended further analysis of the site conditions as well as the development of a soil management plan for use during site redevelopment.