The first new residence hall on Georgia Tech campus since 2005 is a facility for first-year students that will be located on the west side of campus along Northside Drive between Eighth and Ninth streets. The two midrise towers will provide 191,000 square feet of living space containing 860 beds, with the project completion scheduled for the fall of 2026. For this site, Georgia Tech retained United Consulting to gather preliminary geotechnical data that assisted in the planning and design phase of the project. Additionally, Georgia Tech wanted to conduct site-specific shear wave survey to see if the seismic Site Classification could be upgraded beyond what could be achieved by just conducting a typical geotechnical exploration. Once this site progressed to the construction phase, Lord Aeck & Sargent Planning and Design, Inc. retained United Consulting to provide full-scale Construction Materials Testing and Special Inspections services.
At this site six (6) geotechnical standard penetration test (SPT) borings were conducted to assess the general type and condition of the subsurface soils. This information was then used to provide preliminary recommendations regarding site grading and earthwork, quality control and potential groundwater issues. Based on the anticipated building type and typical column and wall loads, we also provided potential foundation and retaining wall design information. We identified the approximate depth to rock noting that difficult excavation was likely to be encountered. We identified soft soils existing and the soil’s potential reuse as engineering fill would be applicable should significant grading be planned. We then conducted a site-specific shear wave survey at the site to investigate the soil’s shear velocity profile to a depth of 100 feet. As part of our construction material testing scope our field personnel observed installation of the aggregate piers, verified installation of the reinforced steel, performed concrete sampling and testing, completed inspections of the bolted and welded connections of the structural steel elements, and extensive fireproofing testing. To perform the range of tasks outlined above, United Consulting utilized a group of qualified certified special inspectors and technicians.
Preliminary geotechnical exploration provided its greatest value by establishing the general conditions of the subsurface from an engineering design and construction perspective. Our geotechnical report also presented foundation options for the design team to consider. This baseline data assisted the designers in determining if it is cost efficient to develop the property as initially envisioned. During construction, United Consulting personnel worked closely with the design and construction team to make sure that all required testing and inspections were performed in a timely manner. All deficiencies noted in our field visits were immediately communicated to the general contractor, which helped them take any necessary corrective actions to minimize construction delays. Our scheduling and managing personnel are readily available to assist in making sure the correct personnel are available for the required special inspections. Accurate documentation and timely reporting provide valuable information to the construction and design team keeping them aware of inspection progress. This reporting system also helps save time by keeping our testing and inspections in step with construction progress. This prevents unnecessary costly delays which helps to keep the project on time and on budget.