Embassy Row Multifamily

The Embassy Row development office park was built in the mid-1980s and consisted of five commercial Type-B office Buildings and two parking decks. Conveniently located along SR 400, just to the north of I-285, between MARTA’s Sandy Springs and North Springs stations, this development boasts access to transportation, commercial and residential properties. Portions of this property are currently undergoing redevelopment, including the portion where the Embassy Row Multifamily is being built. This project consisted of the construction of multifamily housing buildings wrapped around a 4-level parking deck. The challenge of this project is that a large 6-story office building needed to be demolished to make room for the new multifamily development. Additionally, an existing, aging MARTA subway tunnel crossed underneath the west side of the construction site. MARTA was concerned with vibrations from the demolition and construction activities impacting the existing subway tunnel that remained in service throughout the ongoing construction above the tunnel.

 

United Consulting initially conducted a pre-construction survey of the approximately 750 feet of tunnel running beneath the site. In order to do so, United Consulting obtained special MARTA safety training to walk inside the tunnel and take over 300 photos to intricately document and map existing cracks and defects. Automated, continuous vibration monitoring was installed both directly on the concrete tunnel at the southern tunnel entrance and in the overburden soil above the tunnel on the construction site. Vibration alarms were set up based on MARTA’s requirements and vibration levels were closely monitored in near real-time throughout construction.

 

United Consulting also provided a Geotechnical Exploration during the site feasibility phase prior to the construction. This exploration included eight (8) standard penetration test (SPT) borings and the excavation of eight (8) test pits. After the completion of the SPT borings, the test pits were conducted to better understand the depth and composition of existing fill soils that were encountered in the borings from the initial development of the site. Additionally, the results from the geotechnical exploration provided the client with valuable information concerning the depth to rock at the site, site preparation recommendations regarding the fill encountered and the existing site conditions while also offering foundation recommendations for both the lightly loaded structures and the parking deck and podium supported buildings.

 

As part of this development, MARTA required that their tunnel beneath the site be evaluated and monitored during substantial construction activities. The automated vibration monitoring system utilized by United Consulting allowed the client to understand how vibrations were affecting the tunnel so that construction activities could be altered if necessary to lessen the impact of construction above the tunnel. A monthly report keeps MARTA informed of the vibration levels to document that vibrations remain within their tolerances. The pre-construction survey provided a reference to understanding whether any existing conditions of the tunnel had changed during and after construction.

 

During construction, an area of unsuitable fill soil was encountered which the client was prepared for based on the findings from our geotechnical exploration. They were able to work with our geotechnical engineer and construction materials testing team to develop a cost-effective solution to stabilize the unsuitable soils in place beneath parking areas. This saved the client significant money since they were able to avoid hauling off and replacing the soil.