I-20/ SR 402 Geotechnical  Pavement Failure Investigation

 

Georgia Department of Transportation (GDOT) has experienced continual intermittent pavement failure along an eastern section of Interstate 20 (I-20) since its original construction in the mid 1960’s. The roadway is constructed of concrete panels, and these failures include vertical displacement, differential settlement, subsequent cracking, and breakage. Occasionally, these problems have been severe enough to require closure of the affected area until repairs can be made. Over the years GDOT has attempted repairs with no long-term success. As time passes, these repairs are becoming more expensive and creating safety concerns within GDOT. In 2024, United Consulting was retained for geotechnical engineering support in conducting an in-depth evaluation and analysis of this section of the I-20 pavement. GDOT’s goal was to try and understand the “root causes” of these premature failures and for potential solutions. This project’s main challenge was the review of over sixty years of historical data related to the roadway’s construction and repair. An additional challenge was that the project area crossed two of Georgia’s Physiographic Provinces, each with distinct soil properties, which can make a single solution difficult to determine.

 

United Consulting began our evaluation by conducting a desktop review in order to understand how the roadway was built, the extent of the failures over time, how GDOT has attempted to mitigate them, and to try and better understand the typical soil conditions in this part of Georgia. This review included GDOT’s historical records, construction and repair history, published geological maps, USDA/ NRCS soil surveys, aerial imagery and previous work performed within the project site area. Based on the information reviewed and discussions with GDOT representatives, we then developed a plan for our field exploration. Our field exploration included collecting 48 concrete cores, at 32 locations, through the roadway surface to determine the exact thickness of the Plain Cement Concrete (PCC) pavement roadway and any subbase materials, gather soil samples and conduct ground penetrating radar (GPR) at select locations. Soil samples were obtained using the Standard Penetration Test (SPT) method to depths of at least 8 feet per GDOT’s request. Additionally, undisturbed Shelby tube samples were collected along with bulk soil samples for further lab testing. The GPR was used in attempt to determine if any anomalies existed, within or below the existing pavement, and to “see” the prevailing subsurface conditions along 200-foot-long lengths of the roadway. Geotechnical laboratory testing was completed on selected SPT split-spoon, Shelby tube and bulk soil samples. The geotechnical soil lab testing included various tests per GDOT, USDA, AASHTO and ASTM: the Unified Soil Classification method GDOT 810.2 Series (Grain-size, Hydrometer and Atterberg Limits tests), California Bearing Ratio (CBR) tests, ASTM Standard Proctor tests, Permeability tests, Unconfined Compression (UC) Strength tests, Unconsolidated Undrained Triaxial Shear (UU) tests, Natural Moisture Content tests and One-Dimensional Swell/ Collapse tests, etc.

 

The focus of our exploration was on the existing roadway, subbase, and subsurface soil conditions. This also included groundwater and drainage conditions below and adjacent to the roadway. Our analysis indicated that there were several underlying factors that could allow movement of the roadway surface. We concluded that a high natural moisture content, high shrink-swell, and low support soil values all contributed to subgrade deterioration. The roadway surface joints were visibly deteriorated, which was allowing water to penetrate the underlying subbase material. The water intrusion was accelerating the weakening of the subgrade and subsequent deterioration and failure of the roadway surface. The innovative solution, i.e., a full-depth replacement of the roadway and subgrade in the failed areas, including a combination of conventional and commercial drainage installation, was acceptable to GDOT out of all solutions presented.  Currently, the specific commercial drainage product is reviewed by GDOT Materials department to get approval as a New Product in their Quality Products List (QPL) for this purpose. This option was recommended to be installed on a trial basis, prior to widespread implementation. If successful, such solution will significantly reduce if not eliminate premature pavement failure thereby reducing lane closures delays, lessening future roadway maintenance costs, and provide safer and improved rideability for the public along this section of I-20 corridor.

Back To Top