This project consists of the reconstruction of the I-95 and I-16 Interchange and widening 7.5 miles of I-16, mostly to the east of this interchange to its intersection with I-516. This project is one of the Major Mobility Investment Program (MMIP) projects because as a Georgia State Freight Corridor I-16 provides an east-west connection from I-75 to the Port of Savannah, which is ranked as the 4th busiest container port in the United States, as well as to Hunter Army Airfield in Savannah. Included in this project is the replacement of the original cloverleaf interchange by reconfiguring the two high volume loop ramps into directional flyover ramps and changing the radius of the lower volume ramps, along with the replacement of four bridges and the rehabilitation of several others. The purpose of this project is to improve operational efficiency as well as to enhance driver safety by reducing the crash rate at this interchange and along this stretch of I-16. With the ramps reconfigured, a smoother transition between these two major interstates will cut travel times by increasing average vehicle speeds while reducing congestion caused by accidents. For this project the client needed our geotechnical engineering support. This included the review of the eight completed bridge foundation investigations (BFI) reports, pile design analyzer (PDA) reports for the bridge foundations, five wall foundation investigations (WFI) reports, and review of settlement monitoring reports. Additional review items include the design and construction plans, shop drawings, etc., prepared by the Contractor’s design team prior to submittal to GDOT for their review and comments.
This project is a Design-Build Project (DB), sponsored by GDOT, which is an expedited contractual process by which the team works under a unified contract to provide both design and construction services. GDOT has found that DB projects often lead to accelerated project schedules due to the enhanced task efficiencies by overlapping the design and construction phases of the project. While typical DB projects accelerate the project delivery GDOT oversees the project design and construction in accordance with Request for Proposal (RFP) requirements. i.e., Design manuals, Design Policy, Technical Provisions, Standard Specifications, processes and guidelines. For this project GDOT has opted to pioneer a new DB process where the prime is a construction company that takes on the liability for delivering the project and retains other engineering firms as part of their team to conduct the various review tasks mentioned above. United’s role in this process is one of acting as an independent consultant for the team as one of the quality control reviewers, and comments on the geotechnical documents produced by the other team members. We make sure that all the Geotechnical related documents adhere to GDOT’s standards and that they are ultimately constructable. We also are required to turn our review around in about one week versus GDOT’s typical 6-to-8-week timeline. Since there are multiple BFI and WFI reports to review, this time savings compounds into months of time saved in the overall project schedule. Our role as an intermediate subject matter expert (SME) ensures that these engineering reports move quickly through GDOT’s review process while maintaining their required level of quality control.
Our team assisted our direct client, i.e., the lead independent consultant, by completing the work they’ve contracted us with expeditiously. This included the quick backcheck of multiple revisions, assisted the prime by providing our expertise in our engineering field in a way that is beneficial to their delivering the project on time and in budget and assisted GDOT by taking on a critical role in testing this pioneering DB project delivery process. This front-end review makes for a more complete report by the time it reaches the GDOT employed Reviewer’s desk and thus a quicker acceptance of the design submittals. This also helped GDOT significantly reduce the potential for being blamed for project delays due to design documents not being approved in a timely manner by the GDOT team. By working for the construction company in such a role, we are committed to maintaining GDOT standards on their behalf while accomplishing the review and approval process in a fraction of the time typically taken for these tasks, thus benefiting both parties in the process. The use of engineering consultants, such as United, in this innovative DB process benefits GDOT and it’s designated consultants by freeing their engineering staff to focus on their many other projects thus limiting delays due to the overall volume of projects they oversee.