In 2022, United Consulting was retained for geotechnical engineering support for the reconstruction of the East Interchange of I-285 at I-20. This ongoing project includes the replacement of many of the connecting ramps along with improvements to approximately 6 additional miles of I-20, mostly to the east of I-285. These changes aim to ease rush hour congestion at this interchange, and the ramp reconfiguration will enhance driver safety for a smoother transition between these two major metropolitan interstates. Our work includes review of the 9 completed bridge foundation investigation reports (BFI), the 16 wall foundation investigation reports (WFI), 3 high mast lighting reports and four soil survey reports. Additional review items include the design and construction plans, shop drawings, etc., prepared by the Contractor’s design team prior to submittal to the Georgia Department of Transportation (GDOT) for review.
This project, sponsored by GDOT, is a Design-Build Project (DB), which is an expedited contractual process by which the team works under a unified contract to provide both design and construction services. Due to enhanced task efficiencies through overlapping the design and construction phases of a project, GDOT has found that DB projects often lead to accelerated project schedules. While typical DB projects accelerate the project delivery, GDOT oversees the project design and construction in accordance with Request for Proposal (RFP) requirements, including design manuals; design policy; technical provisions; and standard specifications, processes, and guidelines.
For this project, GDOT has opted to pioneer a new DB process. In this process, the prime contractor is a construction company that takes on the liability for delivering the project and retains other engineering firms as part of their team to conduct the various review tasks mentioned above. United Consulting acts as an independent consultant for the team as a quality control reviewer, and our team comments on geotechnical documents produced by the other team members. We make sure all geotechnical documents adhere to GDOT’s standards and that geotechnical changes are ultimately constructable. Unlike GDOT’s typical 6-to-8-week timeline, our reviews are required in about one week. Due to having multiple BFI and WFI reports to review, this time savings compounds into months of saved time in the overall project schedule. Our role as an intermediate subject matter expert (SME) ensures that engineering reports move quickly through GDOT’s review process while maintaining their required level of quality control.
Our geotechnical support has played a critical role for GDOT in pioneering the new DB project delivery process. The expeditious work of our team to our direct client, i.e. the lead independent consultant, through backchecking multiple revisions and providing geotechnical expertise to the prime contractor has aided in delivering this project on time and in budget. Our front-end review allows a more complete report by the time it reaches the GDOT-employed reviewer’s desk, enabling a quicker acceptance of design submittals. This process also helps GDOT significantly reduce the potential for being responsible for project delays due to design documents not being approved in a timely manner by the GDOT team. Our role in working for the construction company is committed to maintaining GDOT standards on their behalf while accomplishing the review and approval process in a fraction of the time typically taken for these tasks. The use of engineering consultants such as United Consulting in this innovative DB process benefits both GDOT and their designated consultants by freeing their engineering staff to focus on other projects and limiting delays due to the overall volume of projects they oversee.